Queen Mary’s Grammar School

HGS refurbished Queen Mary’s Grammar School’s swimming pool ventilation system, installing supply and extract fans, reheat coils and a new BMS to improve energy-efficiency and indoor environment.

Work Carried Out:

Swimming Pool Ventilation Refurbishment

Project Value:

£60,000

Project Timescales:

6 Weeks

Scope & Objectives:

Refurbish the School’s Swimming 
Pool Ventilation

Challenges:

Queen Mary’s Swimming pool ventilation replacement was a challenging project. We have to strip-out the existing plant equipment within the plant room and then design the install to fit in the available space within the plant room. We installed a new supply and extract fan with a reheat coil to ensure energy efficiency to the client. We also designed and installed a new standalone BMS system to control the pool equipment and monitor the poolside environment.

Solution:

We had numerous issues with fitting all the plant into the area due to the size of the existing plant room. This meant we had to site the plant in position, measure up all the duct-work to be built in position. The overall install was smart and effective though.

Results:

The swimming pool ventilation replacement was a success!

“HGS delivered an exceptional service from start to finish. The new ventilation system has transformed our facility — efficient, reliable, and completed with minimal disruption. We’re extremely pleased with the results.”

Facilities Manager, Queen Mary’s Grammar School